The investor, Municipal company for Water Supply in the City of Vukovar, commissioned the works on the rehabilitation of a 12 km long sewer system, which we performed by using the trenchless CIPP method.  Pipes from DN200 to DN1000 in diameter were rehabilitated. The project was co-financed by the European Union.

The works were being carried out in all weather conditions - at temperatures ranging from  +40° to -7°C, under heavy rain, snow, frost.

Benefits

01

QUICK INSTALLATION AND REHABILITATION

02

THE WASTE WASTER SYSTEM REGAINED FUNCTIONALITY AFTER BEING DAMAGED IN THE WAR.

03

THE WORKS DID NOT DISRUPT THE LIVES OD THE LOCALS - ENVIRONMENTAL IMPACT WAS MINIMAL - NO EXCESSIVE NOISE, DUST, OR TRAFFIC JAMS.