As a member of a consortium of domestic construction companies, we participated in the works commissioned by the municipal company for wastewater management Odvodnja d.o.o. Poreč. We were in charge of the rehabilitation of sewer collector system, for which we used trenchless technology, i.e. close-to-fit (FFT) and cured-in-place-pipe (CIPP) methods. In total, over 2,700 m of pipelines were rehabilitated. Some of these pipelines were situated at the esplanade and therefore directly exposed to the sea and to a watchful eye of the locals. The entire project of EUR 7,666,020.60 was funded by the EU.
Benefits
THE REHABILITATED PIPELINE (2,700 m) IS NOW WATER-TIGHT.
SEAWATER INGRESS INTO THE SEWER SYSTEM AND PUMPING STATIONS PREVENTED.
PRECONDITIONS FOR THE PROPER FUNCTIONING OF WASTEWATER TREATMENT FACILITIES FULFILLED.